Challenges West Virginia University needed to upgrade the production audio systems across three major sports venues: Mountaineer Field at Milan Puskar Stadium, the WVU Coliseum, and the Caperton Indoor Practice Facility. Each venue presented unique challenges—from structural limitations in the Coliseum’s domed ceiling to integrating new systems with upgraded scoreboards—all while navigating pandemic-era supply [...]
Polar Park – Worcester Red Sox
Metropolitan Interactive2025-08-06T12:49:34-04:00Challenges The Worcester Red Sox, Triple-A affiliate of the Boston Red Sox, needed a modern video production system for their new stadium, Polar Park. The system had to support high-quality live game coverage, replays, and fan engagement content—delivered from a compact control room environment that could handle the demands of professional baseball broadcasting. [...]
Cleveland Cavaliers – Power Portal
Metropolitan Interactive2025-08-05T15:53:56-04:00Challenges The Cleveland Cavaliers wanted to create a one-of-a-kind fan experience at Rocket Mortgage Fieldhouse—something that would captivate guests the moment they entered the venue. The goal was to design a seamless, immersive tunnel that combined high-resolution video and spatial audio, adaptable to different events like NBA games or concerts. The challenge was integrating [...]
LA Dodgers – Baseball Operations Boardroom
Metropolitan Interactive2025-08-05T15:58:21-04:00Challenges Outdated AV system hindered usability and flexibility for meetings, analysis, and interviews. Solutions Installed a 4K LED display, Analog Way Aquilon C processor, ceiling-mounted beamforming mics, auto-focus cameras, and intuitive touch controls. Client Testimonials “The project was excellently executed.”
Steinmetz Hall – Dr. Phillips Center
Metropolitan Interactive2025-08-05T16:11:44-04:00Challenges Steinmetz Hall, a 1,700-seat acoustic theater in Orlando’s Dr. Phillips Center, was envisioned as a world-class, multi-form performance venue with near-perfect acoustics. The challenge was to design and install a highly adaptable AV system that could support a wide range of performances—from orchestral concerts to amplified events—while maintaining the hall’s N1 sound rating, [...]
Javits Center – NYC
Metropolitan Interactive2025-08-13T09:21:13-04:00Challenges The Jacob K. Javits Convention Center in Manhattan underwent a massive 1.2 million-square-foot expansion to improve utility, efficiency, and competitiveness. The challenge was to design and integrate a versatile AV infrastructure across a vast and complex facility—including meeting rooms, a 54,000-square-foot special event space, and a truck marshaling area—while maintaining high performance and [...]
The Loomis Chaffee School
Metropolitan Interactive2025-08-05T15:59:29-04:00Challenges The Loomis Chaffee School in Windsor, Connecticut, sought to renovate and expand its historic Norris Ely Orchard (NEO) Theater as part of the new John D. and Alexandra C. Nichols Center for Theater and Dance. The challenge was to integrate modern AV systems into a limited space while preserving the theater’s original footprint and [...]
UConn Athletic District
Metropolitan Interactive2025-08-14T18:07:08-04:00Challenges The University of Connecticut (UConn) aimed to modernize and consolidate its outdoor sports venues—spanning soccer, lacrosse, baseball, softball, and track and field—into a unified Athletic District. The project required not only enhancing the in-venue fan experience but also building a state-of-the-art broadcast control room capable of supporting both linear TV and streaming. The [...]
The College of the Holy Cross
Metropolitan Interactive2025-08-05T16:02:06-04:00Challenges The College of the Holy Cross needed a comprehensive AV and networking solution for its new 84,000-square-foot Prior Performing Arts Center, which includes a concert hall, studio theater, art gallery, multimedia lab, rehearsal spaces, and a central atrium. The challenge was to create a flexible, building-wide AV system that could route audio and [...]
Pomfret School
Metropolitan Interactive2025-08-05T16:03:40-04:00Challenges Pomfret School’s Hard Auditorium, originally built in 1928, needed a complete renovation to transform it into a flexible, multiuse space for performances, lectures, and school gatherings. The project was complex, involving structural changes and late-stage design modifications, all while preserving the historic character of the building. Solutions Metinteractive provided a comprehensive AV [...]